Prior to Installation Customer is responsible for...
-
All DrillingList Item 1
If your machine is installed under the counter: a 1.5” pre-drilled hole is required for a 2 Tap Tower, and a 2.0” pre-driled hole is required for a 3 Tap Tower. Natura technicians will NOT drill holes
-
All PlumbingList Item 2
Installation technicians are NOT responsible for plumbing of drip tray drain tube
-
Providing Enough Space*List Item 3
(a) 6.0” of clearance on both sides of the unit for ventilation
(b) 2.0” of clearance in in the back, front, and on top of the unit for ventilation
and to allow for checking of the water in the reservoir during preventative maintenance visits.
Note: Please remember to factor CO2 canister and filter kit assembly into clearances.