Prior to Installation Customer is responsible for...
Prior to Installation Customer is responsible for...
-
All DrillingList Item 1
If your machine is installed under the counter: a 1.5” pre-drilled hole is required for a 2 Tap Tower, and a 2.0” pre-driled hole is required for a 3 Tap Tower. Natura technicians will NOT drill holes
-
All PlumbingList Item 2
Installation technicians are NOT responsible for plumbing of drip tray drain tube
-
Providing Enough SpaceList Item 3
(a) 6.0” of clearance on both sides of the unit for ventilation
(b) 2.0” of clearance in front and at the back of the unit for ventilation
(c) 14.0" minimum clearance above the unit for removing the top to perform routine maintenance and to allow for checking of the water in the reservoir during reventative maintenance visits.
Note: Please remember to factor CO2 canister and filter kit assembly into clearances.

